HOME  |  ABOUT INCDT  |  PROJECTS  |  PUBLICATIONS  |  CONTACT
Home > Activities


Activities of the project

Stage I The legal and conceptual frame of the tourist territory planning, at national and European level

The activities of this stage involve:

  • establishing the role and importance of the territory tourist planning concept;
  • the study of the tourist planning typologies and strategies
  • the diagnosis analysis of the territory - premise of tourist planning;
  • the analysis of the accommodation capacity of a territory, respectively its ecological carrying capacity reported to the natural and human resources and the space where they can be found
  • the study of conventional norms for the tourism territory planning, at national and European level
  • drawing up reports concerning tourist planning, categorised on tourist resorts


Stage II The optimization of the complex indicators system and creation of the informatics module for monitoring the ecological carrying capacity in tourist areas/resorts

This stage involves carrying out the following activities:

  • the optimization of the 'synthetic' and correlation indicators in order to determine the ecological carrying capacity for tourist resorts;
  • the projection of the informatics module for monitoring the ecological carrying capacity;
  • gathering the necessary information for simulation;
  • verifying the activity of the projected parameters

Stage III Implementing the informatics system for monitoring the ecological carrying capacity

  • a logical and functional projection of the informatics system, defining the realisation particularities (architecture, the technologies used, functional blocks and implementation details);
  • projecting the data base pattern;
  • projecting the auxiliary components (the working interface for the user, security component, graphical reporting component etc); testing and implementing the informatics system; drawing up the operating manual for the informatics product sharing and capitalizing the results
  • testing and implementing the informatics system;
  • drawing up the operating manual for the informatics product
  • sharing and capitalizing the results

Toate drepturile rezervate INCDT
Home  |  About INCDT  |  Projects  |  Publications  |  Contact